Packaging for
Types of package
Description
Verpak-A3M + UT-650 is a fully automatic complex. It consists of a conveyor, a packaging device and a thermal tunnel. The conveyor forms a group of products that enters the packaging device. After packaging with a film, the group enters the thermal tunnel. There, under the influence of hot air, the film shrinks and tightens the products.
Depending on the final layout of the room, the machine can be implemented with a side feed conveyor or with a direct-flow conveyor.
Automatically packs in a thick plastic film groups of any products for which transport packaging is usually needed: bottles, pet containers, jars, bags with bulk products.
It can do packaging on a cardboard substrate or with partitions, which is important when packaging glass containers.
The complex is suitable for large-scale production and can be easily integrated into any automated line. Equipped with Japanese OMRON controllers and CAMOZZI pneumatics
Characteristics
Productivity, pack / hour | no more than 600 |
---|---|
Dimensions of the packaged item (s), mm: | |
Length | from 150 to 380 |
Width | from 200 to 480 |
Height | from 115 to 350 |
Packing material | PE Thermoshrinkable GOST-25951-86 |
Film thickness, microns | from 50 to 120 |
The maximum width of the film roll, mm | no more than 590 |
Minimum film roll width, mm | 250 |
Diameter of a roll of a film, mm, no more | 400 |
Weight of a roll, kg, no more | 30 |
Chain speed, m / min | 19.4 (adjustable) |
Number of memorized programs, pcs | 30 |
Packer Power Supply | 380 V, 50 Hz |
Shrink tunnel power | 380 V, 50 Hz |
Power consumption, kW, no more | 28 |
Temperature range, * С | from 100 to 250 |
Air consumption, liter / min. | 400 |
Air pressure, Mpa | 0,6—1 |
Body material | structural steel |
Contact surface material | Food approved materials |
Overall dimensions of the device (length × width × height), mm | 7000х1200х2000 |
Weight, kg | 1050 |
Delivery is carried out in several ways:1) The customer independently picks up the equipment and the cargo travels from point "A" to point "B" 2) We deliver the equipment to the terminal of the transport company chosen by the customer in Kazan - carried out by our own forces (own vehicles). 3) Urgent small loads (for example, spare parts), in this case we resort to air transportation. 4) The fourth method is "mixed", when the equipment can go first by road, then railway transportation, and then delivery by river transport.The shipment of cargo is mainly carried out by the transport company PEC, small parcels - through SDEC Check the delivery time of the cargo with your manager. On average, delivery takes from 2 to 5 days, long–distance destinations - from 1 week.Payment:1) The delivery is paid, after that Integral Plus LLC pays the invoice under the contract with the transport company; 2) Payment directly by TC on the invoice.
1 year warranty.After purchasing the equipment, you get a 1-year warranty. It includes: - online consultations on commissioning and debugging of all processes; - delivery of spare parts and repairs at our expense if necessary; - solution of all issues related to the smooth and productive operation of the equipment.Warranty for 2 years.In order to get a factory warranty for 2 years, it is necessary to carry out commissioning.3-year warranty.An extended 3-year warranty can be purchased for a fee.